Marshall County KLBIP #58 C-5273-01 Bridge Replacement - Marshall County, KS

Project No. 58 C-5273-01

Status

Accepting Bids

Bid Date 7/25/25 4:00pm

Company & Contacts

Schwab Eaton P.A.
David Beach  
785-539-4687

Location

Marhsall County, KS

Date Issued: 7/9/2025

Sealed proposals submitted in an envelope plainly marked “Project No. 58 C-5273-01 Proposal” will be received at the office of County Public Works, Marshall County Courthouse, Marysville, Kansas, until the above time. At 9:00 am on Monday July 28th, 2025 which time the proposals will be publicly opened and read aloud in the County Commissioners’ Office:

PROJECT NO. 58 C-5273-01

The Project consists of the replacement of Marshall County Bridge Number 23.0-G.8, located 2.7 Miles North and 2.5 Miles East of Beattie. The proposed bridge is a 45’-0” WBMS Bridge with 24’-0” Roadway.

The bid quantities for the project consist of the following total approximate quantities of work:

  • Concrete (Grade 4)(AE)(SW)...…………………………… 27.7 Cu. Yds.

  • Reinforcing Steel (Grade 60)………………..……………... 7,230 Lbs.

  • Structural Steel (M270)(Gr 50WT3)………………………. 28,350 Lbs.

  • Structural Steel (A709)(Gr 50W)………………………….. 9,460 Lbs.

  • Structural Steel (A709)(Gr 36)………….…………………. 4,330 Lbs.

  • Guardrail, Steel Plate………………………………………. 88 Lin. Ft.

  • Piles (Corrugated Metal Sheet)……………………………. 2,808 Sq. Ft.

  • Piles (Steel)(HP10x42)…………………………………….. 675 Lin. Ft.

  • Slope Protection (Riprap Stone)…………………………… 98 Cu. Yds.

  • Contractor Construction Staking…………………………... Lump Sum

  • Mobilization……………………………………………….. Lump Sum

  • Removal of Existing Structures……………………………. Lump Sum

  • Curing Environmental……………………………………... Lump Sum

  • Clearing & Grubbing………………………………………. Lump Sum

  • Common Excavation………………………………………. 615 Cu. Yds.

  • Compaction of Earthwork (Type B)(MR-90)……………... 166 Cu. Yds.

  • Water (Grading)(Set Price)………………………………... 1 M Gal

  • Signing Object Marker (Type 3)…………………………... 4 Each

  • Temporary Surfacing Material (Aggregate)(Set Price)……. 1 Cu. Yd.

  • Foundation Stabilization (Set Price)………………………. 1 Cu. Yd.

  • Concrete for Seal Course (Set Price)………………………. 1 Cu. Yd.

  • Traffic Control……………………………………………... Lump Sum

  • Seeding……………………………………………………... Lump Sum

  • Water Pollution Control……………………………………. Lump Sum

  • Surfacing Material (AB-3)…….…………………………… 25 Tons