Sealed proposals submitted in an envelope plainly marked “Project No. 58 C-5273-01 Proposal” will be received at the office of County Public Works, Marshall County Courthouse, Marysville, Kansas, until the above time. At 9:00 am on Monday July 28th, 2025 which time the proposals will be publicly opened and read aloud in the County Commissioners’ Office:
PROJECT NO. 58 C-5273-01
The Project consists of the replacement of Marshall County Bridge Number 23.0-G.8, located 2.7 Miles North and 2.5 Miles East of Beattie. The proposed bridge is a 45’-0” WBMS Bridge with 24’-0” Roadway.
The bid quantities for the project consist of the following total approximate quantities of work:
Concrete (Grade 4)(AE)(SW)...…………………………… 27.7 Cu. Yds.
Reinforcing Steel (Grade 60)………………..……………... 7,230 Lbs.
Structural Steel (M270)(Gr 50WT3)………………………. 28,350 Lbs.
Structural Steel (A709)(Gr 50W)………………………….. 9,460 Lbs.
Structural Steel (A709)(Gr 36)………….…………………. 4,330 Lbs.
Guardrail, Steel Plate………………………………………. 88 Lin. Ft.
Piles (Corrugated Metal Sheet)……………………………. 2,808 Sq. Ft.
Piles (Steel)(HP10x42)…………………………………….. 675 Lin. Ft.
Slope Protection (Riprap Stone)…………………………… 98 Cu. Yds.
Contractor Construction Staking…………………………... Lump Sum
Mobilization……………………………………………….. Lump Sum
Removal of Existing Structures……………………………. Lump Sum
Curing Environmental……………………………………... Lump Sum
Clearing & Grubbing………………………………………. Lump Sum
Common Excavation………………………………………. 615 Cu. Yds.
Compaction of Earthwork (Type B)(MR-90)……………... 166 Cu. Yds.
Water (Grading)(Set Price)………………………………... 1 M Gal
Signing Object Marker (Type 3)…………………………... 4 Each
Temporary Surfacing Material (Aggregate)(Set Price)……. 1 Cu. Yd.
Foundation Stabilization (Set Price)………………………. 1 Cu. Yd.
Concrete for Seal Course (Set Price)………………………. 1 Cu. Yd.
Traffic Control……………………………………………... Lump Sum
Seeding……………………………………………………... Lump Sum
Water Pollution Control……………………………………. Lump Sum
Surfacing Material (AB-3)…….…………………………… 25 Tons