RFQ Progressive Design Build - Brush Creek Pump Station Improvements Project (MTM1-C080)
Status
Accepting Bids
| Prebid Date | 11/12/26 9:00am |
| Bid Date | 12/9/26 2:00pm |
Location
Prairie Village, KS
REQUEST FOR QUALIFICATIONS (RFQ)
FOR
PROGRESSIVE DESIGN BUILD - BRUSH CREEK
PUMP STATION IMPROVEMENTS PROJECT
(MTM1-C080)
RFQ NUMBER: 2026-045
ISSUE DATE: 11/4/2026
OPEN DATE & TIME: 12/9/2026 2:00 PM
Purchasing Administrator: Nicole Averell, CPPO, CPPB
Contact Information: nicole.averell@jocogov.org 913-715-0595
2.2. PROJECT DESCRIPTION
JCW is seeking SOQs from qualified Design-Builders to initially provide pre-construction services and design services to complete the design based on HDR’s 2026 Preliminary Engineering Report. JCW and Owner’s Advisor will assist the Design-Builder to design and construct a new Brush Creek Pump Station. The Progressive Design Build will follow a two-phase format. In Phase 1, the Design-Builder will be responsible for working with JCW to reach an agreeable GMP anticipated to be finalized around 60% design. Multiple GMPs may be allowed assuming they are mutually agreeable, that schedule allows, and they benefit the project. Depending on the cost and the progress of the project, if the GMP is favorable then JCW will seek BOCC approval to amend the agreement and continue into Phase 2, the construction phase, with the Design-Builder. If a satisfactory GMP cannot be reached, JCW may elect to off-ramp the project and will need to negotiate design services to 100% design including bidding services in order to hard-bid the project.
The estimated total project cost, including engineering, easements, land acquisitions, and construction is between $12-$17 million, which includes escalation to midpoint of construction in 2029.
2.3. TENTATIVE PROJECT SCHEDULE
A preliminary engineering report has been completed for this project by the Owner’s Advisor. The following overall project milestones are provided below for reference and are intended to provide a general intent for project duration. The actual design and construction milestones will be determined in the design phase with the Design-Builderprior to the GMP.
RFQ Advertised November 4, 2026
Notice to Proceed June 2027
Design and GMP Development June 2027- September 2028
Complete Design December 2028
Begin Construction January 2029
Substantial Completion September 2030
Final Completion December 2030
The Agreement with Prairie Village contains requirements and timelines for work on this project and the use of the baseball field in Porter Park. The City is allowing two years of use of the field including restoration, which is to be provided by the Design-Builder. The Agreement is being finalized and will be made available with the RFP. The details of the executed Agreement shall supersede any requirements stated herein. The BOCC approval process requires sixty days assuming that all the information, data, costs, contracts, etc. are ready at the start of this process. The Design-Builder shall take this duration into account for any schedule planning.
3. QUESTIONS
To ensure open and fair competition for all potential respondents, ALL questions and contact concerning this RFQ shall be directed to the Johnson County Purchasing Administrator.
We encourage you to submit questions up until the cutoff date and time by selecting ‘Ask Question’ on the solicitation event at: https://jocogov.ionwave.net
Respondent should make NO CONTACT, either written or verbal, with the Board of County Commissioners, Johnson County legal counsel, department personnel, consultants, or other county boards beginning with the issuance of this document through approval of award.
4. NON-MANDATORY PRE-SELECTION CONFERENCE
A Pre-Selection Conference will be held on November 12, 2026, at 9:00 a.m., CT via Zoom Video Conferencing.
This Conference is optional and not mandatory for responding to this RFQ. The purpose of this meeting is to explain the solicitation process and go over general information for the Project. Access is available here:
Join Zoom Meeting
https://us02web.zoom.us/j/89153467458?pwd=DSm3FoRzj1U3JLVhgngFYIV804087e.1
Meeting ID: 891 5346 7458
Passcode: 999099
9.5. STATEMENT OF QUALIFICATONS OPENING
Virtual RFQ openings are held via Zoom Meeting publicly on the opening date and at the opening time specified on the RFQ document at the link provided below. Respondents may notify the purchasing administrator no less than two (2) business days before the bid opening if they wish to attend the opening in person for accommodation.
Join Zoom Meeting
https://us02web.zoom.us/j/85772755088?pwd=ltuGNDFNSkRoaFrgB8DQFgXsaS7bqk.1
Meeting ID: 857 7275 5088
Passcode: 334805
It is the respondent’s responsibility to ensure that the SOQ is submitted electronically by the official opening date and time at https://jocogov.ionwave.net. Late submissions will not be considered regardless of the degree of lateness or the reason related thereto, including causes beyond the control of the respondent.
Unofficial results of the SOQ’s that have been submitted will be available electronically at https://jocogov.ionwave.net within 24 hours of the opening.