Greenwood Elementary School Public Improvements Project
Status
Bidding Closed
| Prebid Date | 10/27/26 2:00pm |
| Bid Date | 11/10/26 2:00pm |
Location
Greenwood, MO
FROM:
1.01 THE OWNER (HEREINAFTER REFERRED TO AS OWNER:
A. Lee's Summit R-7 School District
B. Address:
301 NE Tudor Road
Lee's Summit, Missouri, 64086
1.02 AND THE ENGINEER (HEREINAFTER REFERRED TO AS ENGINEER:
A. Kaw Valley Engineering, Inc.
B. Address:
14700 W. 114th Terrace
Lenexa, KS 66215
1.03 DATE: OCTOBER 19, 2026
1.04 TO: QUALIFIED BIDDERS
A. Contractors are invited to submit an offer under seal to Owner for construction of Public road improvements on S Allendale Lake Road and within the Rolling Ridge Subdivision in Greenwood, Missouri to support the new Elementary School currently under construction.
Before 2:00pm local standard time on Tuesday, November 10th, 2026.
Bid will be opened and read aloud at this time.
Bids received after this time will not be accepted.
A Pre-Bid Meeting will be held on October 27th, 2026 at 2:00PM. At the Lee’s Summit Facility’s Building
Lee's Summit R-7 Schools
502 SE Transport Drive
Lee's Summit, MO 64081
Large Breakroom
B. Project: Greenwood Elementary School Public Improvement Project
C. Bid Documents for a Stipulated Sum contract may be obtained from Drexeltech.com Plan Room.
D. Documents may be obtained only by general contract Bidders. Others may view the Bid Documents at the Drexeltech.com Plan Room.