Skip to main content

Greenwood Elementary School Public Improvements Project

iDS Project No. 25-111 | KVE Project No. C25D2252-1
You need to register or login to order prints and download files from this project.

Status

Bidding Closed

Prebid Date 10/27/26 2:00pm
Bid Date 11/10/26 2:00pm

Company & Contacts

Kaw Valley Engineering Inc.
David Wood  
913-894-5150

Location

Greenwood, MO

FROM:

1.01 THE OWNER (HEREINAFTER REFERRED TO AS OWNER:

A. Lee's Summit R-7 School District

B. Address:

301 NE Tudor Road

Lee's Summit, Missouri, 64086

1.02 AND THE ENGINEER (HEREINAFTER REFERRED TO AS ENGINEER:

A. Kaw Valley Engineering, Inc.

B. Address:

14700 W. 114th Terrace

Lenexa, KS 66215

1.03 DATE: OCTOBER 19, 2026

1.04 TO: QUALIFIED BIDDERS

A. Contractors are invited to submit an offer under seal to Owner for construction of Public road improvements on S Allendale Lake Road and within the Rolling Ridge Subdivision in Greenwood, Missouri to support the new Elementary School currently under construction.

Before 2:00pm local standard time on Tuesday, November 10th, 2026.

Bid will be opened and read aloud at this time.

Bids received after this time will not be accepted.

A Pre-Bid Meeting will be held on October 27th, 2026 at 2:00PM. At the Lee’s Summit Facility’s Building

Lee's Summit R-7 Schools

502 SE Transport Drive

Lee's Summit, MO 64081

Large Breakroom

B. Project: Greenwood Elementary School Public Improvement Project

C. Bid Documents for a Stipulated Sum contract may be obtained from Drexeltech.com Plan Room.

D. Documents may be obtained only by general contract Bidders. Others may view the Bid Documents at the Drexeltech.com Plan Room.