2025 Concrete Project - Bonner Springs, KS

Status

Bidding Closed

Bid Date 8/14/25 3:00pm

Company & Contacts

City of Bonner Springs
Matt Beets  
913-441-1960 x 1714

Location

Bonner Springs, KS

Date Issued: 7/31/2025


Purpose.

This project consists of approximately 370 linear feet of curb and gutter removal and replacement, 1,870 square feet of sidewalk replacement, and 6,760 square feet of driveway approaches and apron reconstruction. All concrete work shall utilize KCMMB 4K concrete, except for three designated driveway approach and apron locations, which shall require KCMMB 4K concrete modified with a 24-hour high-early strength additive to allow reopening to traffic within 24 hours of placement.

The driveway apron at the Fire Station (identified as Location "R" on the attached map) shall be constructed in phases to maintain uninterrupted emergency vehicle access to the facility at all times. Coordination with the Fire Department is required prior to beginning work at this location. Similarly, the two driveway approaches at Centennial Park (Locations "K" and "L") must not be closed simultaneously. At least one access point to the parking lot must remain open at all times during construction.

The Contractor is responsible for providing and maintaining all necessary traffic control in accordance with the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and shall issue timely notifications to affected residents and facility staff throughout the duration of the project.

Points of Contact.

Questions concerning this request are to be directed to:

• Matt Beets, Director of Public Works (office-913-441-1961)

• Jimmy Denton, Street Superintendent (office-913-441-1961)

Sealed bids Must Be Received No Later Than the above time.

Please mark bid on the outside envelope "2025 Concrete Project" and submit to:

City Clerk

City of Bonner Springs

200 East Third Street, P.O. Box 38

Bonner Springs, KS 66012

(913) 422-1020 x 1328